Line 7, Shenzhen Metro
| Line 7, Shenzhen Metro | |
|---|---|
|
| |
| Overview | |
| Type | Rapid transit |
| System | Shenzhen Metro |
| Status | Operational |
| Locale | Shenzhen, China |
| Termini |
Xili Lake Tai'an |
| Stations | 28 |
| Operation | |
| Planned opening | 28 October 2016 |
| Operator(s) | SZMC (Shenzhen Metro Group) |
| Character | Underground |
| Technical | |
| Line length | 30.173 km (18.75 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Line 7 (Chinese: 七號線; Jyutping: Cat1 Hou6 Sin3) is a line of the Shenzhen Metro with a length of 30.3 km and a total of 28 stations. It connects the Xili Lake to Tai'an. The line travels East–West across Shenzhen in a "V" shape. Construction started on 23 October 2012, with track laying complete in April 2016.[1] The line started service on 28 October 2016.[2]
Rolling stock
In 2014, Shenzhen Metro Group purchased 70 trains (420 carriages) from CNR Changchun Railway Vehicles for the future Line 7 and Line 9, in which Line 7 will use 41 while Line 9 will use 29.[3] The first train arrived in mid-March 2016.
Stations
- All of these names and the transfers may be changed in future.
| Station name | Transfer | Location | |
|---|---|---|---|
| English | Chinese | ||
| Xili Lake | 西丽湖 | ||
| Xili | 西丽 | 5 | |
| Chaguang | 茶光 | ||
| Zhuguang | 珠光 | ||
| Longjing | 龙井 | ||
| Taoyuancun | 桃源村 | ||
| Shenyun | 深云 | ||
| Antuo Hill | 安托山 | 2 | |
| Nonglin | 农林 | ||
| Chegongmiao | 车公庙 | 1 11 Cross-platform transfer 9 | |
| Shangsha | 上沙 | ||
| Shawei | 沙尾 | ||
| Shixia | 石厦 | 3 | |
| Huanggangcun | 皇岗村 | ||
| Fumin | 福民 | 4 | |
| Huanggang Checkpoint | 皇岗口岸 | ||
| Fulin | 福邻 | Not in service | |
| Chiwei | 赤尾 | ||
| Huaqiang South | 华强南 | ||
| Huaqiang North | 华强北 | 2 1 via Huaqiang Rd Station | |
| Huaxin | 华新 | 3 | |
| Huangmugang | 黄木岗 | Cross-platform transfer 14 | |
| Bagualing | 八卦岭 | ||
| Hongling North | 红岭北 | 9 | |
| Sungang | 笋岗 | ||
| Honghu | 洪湖 | ||
| Tianbei | 田贝 | 3 | |
| Tai'an | 太安 | 5 | |
Extension
Line 7 may have a north or east extension, and a branch for Metro Culture and Sports Center station. It may open along with Metro Culture and Sports Center in 2018. Train for that branch has already arrived.
| Station name | Transfer | Location | |
|---|---|---|---|
| English | Hanzi | ||
| Metro Culture and Sports Center | 地铁文体公园 | ||
References
- ↑ "记录施工中的深圳地铁7号线" (in Chinese). 深圳新闻网. 2012-11-12.
- ↑ "深圳地铁7号线和9号线10月底通车 比计划提前两个月". Retrieved 27 August 2016.
- ↑ "中国北车揽30亿元深圳地铁大单 将装备7号线和9号线_深圳新闻_最全最迅速的深圳资讯—深圳新闻网". www.sznews.com (in Chinese). Retrieved 2016-06-11.